Project Overview
Cell Chemistry: LiFePO₄ (LFP)
Production Capacity (Phase-1):
1 GWh per day based on 8 working hours
Expandable Capacity (Phase-2):
2 GWh per day based on 16 working hours
Operation Mode: Continuous / scalable (modular design preferred)
Project Type: EPC / Turnkey Supply (Design + Equipment + Installation + Commissioning)
2. Cell Specifications (Indicative)
Please quote based on one standard model and indicate flexibility:
Cell Type: Prismatic (preferred) / Cylindrical (optional)
Nominal Voltage: ~3.2 V
Capacity Range: 100Ah / 150Ah / 280Ah (mention all compatible designs)
Energy Density Target: ≥160 Wh/kg (clearly specify achievable specs)
Cycle Life: ≥6000 cycles @ 80% DoD
End Applications: EV, ESS, Industrial storage
Scope of Supply
A. Electrode Manufacturing
Raw material feeding & mixing system
Slurry preparation (anode & cathode)
Coating machine (single/double side)
Drying oven system
Calendaring machine
Slitting machine
Electrode vacuum baking
B. Cell Assembly
Cutting / stacking / winding system
Tab welding (laser / ultrasonic)
Cell forming & sealing
Electrolyte filling (vacuum filling)
Cell cleaning & drying
Final sealing
C. Formation & Aging
Formation system (high precision)
Aging racks (controlled environment)
Automatic grading & sorting
D. Testing & Inspection
OCV / IR testing
Capacity grading
Leak testing
Visual & dimensional inspection
Traceability & MES interface
4. Automation & Software
Automation level: Semi / Fully automatic (specify)
Robotics usage (if any)
Central PLC / SCADA control
MES compatibility
Full production data logging & traceability
5. Utilities & Infrastructure
Please provide utility consumption details:
Power requirement (kW)
Compressed air
Cooling water
HVAC & Dry Room specifications (dew point ≤ -40°C)
Clean room class
Floor loading & space requirement
Layout drawing (2D/3D)
6. Expansion Philosophy (Very Important)
Design must allow capacity expansion from 1 GWh → 2 GWh
Additional equipment vs parallel line concept to be clearly explained
Expansion downtime requirement (if any)
7. Standards & Compliance
IEC / UL / UN38.3 compliance readiness
CE certification for equipment
Safety standards & interlock systems
EHS & fire protection philosophy
8. Project Execution
Engineering & design timeline
Manufacturing lead time
Installation & commissioning duration
Training scope (China / Site)
Manpower requirement during commissioning
9. Commercial Details (Item-wise Mandatory)
Please submit itemized pricing including:
Line-wise & equipment-wise cost
Dry room & utilities (separately)
Spares & consumables
Optional items
Taxes & duties (HS code mentioned)
Packing & logistics
Warranty period
After-sales & AMC options